The layout worker behind calendar_wall_plot(): one row per day
cell with facet key and grid position. Two arrangements:
Usage
calendar_wall_layout(
x,
year = NULL,
arrange = c("weekday", "sequence"),
week_start = "MON"
)Arguments
- x
A
Calendarwith a day-resolution timeframe (YDAYorMDAY). Sub-daily timeframes are collapsed to the day layer viaprune_calendar().- year
Integer model year (required for the weekday arrangement;
NULLfalls back to"sequence"with a message).- arrange
"weekday"or"sequence"(see above).- week_start
Weekday the week starts on: one of
"MON".."SUN"(default"MON", ISO).
Value
A data.frame: timeslice, MONTH (factor in member
order), label (day-of-month number), col, row, wday
(factor, NA in sequence mode), date (NA in sequence mode).
Details
arrange = "weekday"– a true wall calendar: columns are weekdays (starting atweek_start), rows are weeks of the month. Needsyear(weekdays are year-specific); whenyearisNULLit FALLS BACK to"sequence"with a message.arrange = "sequence"– year-free: days flow left-to-right in fixed 7-wide rows, no weekday meaning.
Examples
head(calendar_wall_layout(calendar("m12_md365"), year = 2021))
#> timeslice MONTH label col row wday date
#> 1 m01_d01 m01 1 5 1 FRI 2021-01-01
#> 2 m01_d02 m01 2 6 1 SAT 2021-01-02
#> 3 m01_d03 m01 3 7 1 SUN 2021-01-03
#> 4 m01_d04 m01 4 1 2 MON 2021-01-04
#> 5 m01_d05 m01 5 2 2 TUE 2021-01-05
#> 6 m01_d06 m01 6 3 2 WED 2021-01-06
head(calendar_wall_layout(calendar("m12_md365"))) # sequence fallback
#> weekday arrangement needs `year=` (weekdays are year-specific); falling back to arrange = "sequence"
#> timeslice MONTH label col row wday date
#> 1 m01_d01 m01 1 1 1 <NA> <NA>
#> 2 m01_d02 m01 2 2 1 <NA> <NA>
#> 3 m01_d03 m01 3 3 1 <NA> <NA>
#> 4 m01_d04 m01 4 4 1 <NA> <NA>
#> 5 m01_d05 m01 5 5 1 <NA> <NA>
#> 6 m01_d06 m01 6 6 1 <NA> <NA>